In refurbishment projects it is advisable or often even essential to reinforce existing floors. Removing existing timber floors and installing new concrete structures is avoided by means of timber-concrete composite structures. SFS intec's composite element enables timber and concrete to be joined efficiently, without having to remove well-preserved existing structures. The disturbing creaking of existing timber beams is also eliminated in the process.
Compared with the conventional method, removal of the floor or complicated reinforcement of the timber beams with boards or steel butt straps is unnecessary. This also eliminates the additional cost of disposing of the material removed. Construction time is reduced by more than half in this way. The timber-concrete composite structure also substantially improves fire protection and sound insulation compared with pure structural timberwork (30 – 67 dB). Refurbishing floors with SFS intec's composite system means working faster, more comfortably and more safely.
With the timber-concrete composite system you can inexpensively combine timber - the natural building material - with concrete to produce a secure floor structure. Simply attach shuttering to the timber beams, install a separating layer, set composite elements and pour the concrete - that's all. If necessary, building services installations are laid before the concrete is poured.
The timber-concrete composite element produces a secure floor structure in every case. In new buildings with or without floating sub-floors the timber-concrete composite structure improves both sound insulation and fire protection compared with a pure timber floor. Installing floor structures in new buildings with SFS intec's VB composite element means implementing creative visions at low cost through the rational combination of timber and concrete.
In the introduction of the composite system our qualified technical specialists provide advice and support during the project planning phase and installation work directly on the construction site.
Im Dachgeschoss des alten Schulgebäudes wird ein neuer Fußbodeneingebracht. Der Aufbau besteht aus einer Blechplatte, einerFußbodenheizung und einer dünnen Estrichschicht.
zum VideoAusbau des Dachstuhls
Bei der Fußbodenheizung ist die Aufbauhöhe zu beachten, die je nach System verschieden ist und unter dem Dach schon mal ein Ausschlusskriterium sein kann. Gleiches trifft auf den Fußboden generell zu.
weiter lesenStahlbleche als Unterboden für den Estrich
Als Ersatz für marode Dielen bieten sich so genannte Schwalbenschwanzplatten an (von Spillner), die als Schalung und Bewehrung für Estriche oder Beton dienen.
weiter lesen
Mit den Metallschalungen „Lewis“ und „Max 4“ hat das Unternehmen Spillner Spezialbaustoffe (SSB) für jede erdenkliche Situation bei der Fußbodensanierung die passende Lösung im Programm.
zum ArtikelMAX4® Fußbodensystem mit speziellem Stahlgewebe für besonders dünne und leichte Estrichböden.
weiter lesenFußbodensanierung leicht gemacht.
Mit den Produkten LEWIS ®, HODY ® und MAX 4 ® sind Architekten, Bauherren und Handwerker für jede Fußbodensanierung gut gerüstet.
weiter lesen