SSB Spillner Spezialbaustoffe GmbH

LEWIS® auf dem Handy-Bildschirm
Das mobile LEWIS®-Portal

QR-Link
Code mit Smart­phone scannen, und Sie haben alle Infos auch mobil zur Hand!

The VB system is a self-drilling composite system

Reliable, individual and low-cost
The VB system is a self-drilling composite system for assembling timber/concrete composite floors.

The VB system is a self-drilling composite system

The well-proven composite system for refurbishment projects and new buildings 

Refurbishment projects

A cost-saving method of joining timber and concrete

In refurbishment projects it is advisable or often even essential to reinforce existing floors. Removing existing timber floors and installing new concrete structures is avoided by means of timber-concrete composite structures. SFS intec's composite element enables timber and concrete to be joined efficiently, without having to remove well-preserved existing structures. The disturbing creaking of existing timber beams is also eliminated in the process.

A comparison which pays off

Compared with the conventional method, removal of the floor or complicated reinforcement of the timber beams with boards or steel butt straps is unnecessary. This also eliminates the additional cost of disposing of the material removed. Construction time is reduced by more than half in this way. The timber-concrete composite structure also substantially improves fire protection and sound insulation compared with pure structural timberwork (30 – 67 dB). Refurbishing floors with SFS intec's composite system means working faster, more comfortably and more safely.

Self-drilling composite system screws


New buildings

Implement creative visions at low cost in new buildings

With the timber-concrete composite system you can inexpensively combine timber - the natural building material - with concrete to produce a secure floor structure. Simply attach shuttering to the timber beams, install a separating layer, set composite elements and pour the concrete - that's all. If necessary, building services installations are laid before the concrete is poured.

Secure timber beams statically attached to the concrete floor

The timber-concrete composite element produces a secure floor structure in every case. In new buildings with or without floating sub-floors the timber-concrete composite structure improves both sound insulation and fire protection compared with a pure timber floor. Installing floor structures in new buildings with SFS intec's VB composite element means implementing creative visions at low cost through the rational combination of timber and concrete.


Working economically with the support of specialists

In the introduction of the composite system our qualified technical specialists provide advice and support during the project planning phase and installation work directly on the construction site.


Dachgeschoss Seminarraum
Spillner Spezialbaustoffe GmbH
Daimlerstraße 9
23617 Stockelsdorf

Tel. (0451) 880 564 04 Fax( 0451 ) 880 595 50
E-Mail: 
doit-tv verlegen

Neue Fußbodenheizung auf alten Balken

Im Dachgeschoss des alten Schulgebäudes wird ein neuer Fußbodeneingebracht. Der Aufbau besteht aus einer Blechplatte, einerFußbodenheizung und einer dünnen Estrichschicht.

zum Video
U&M - Cover

Umbauen & Modernisieren

Ausbau des Dachstuhls

Bei der Fußbodenheizung ist die Aufbauhöhe zu beachten, die je nach System verschieden ist und unter dem Dach schon mal ein Ausschlusskriterium sein kann. Gleiches trifft auf den Fußboden generell zu.

weiter lesen
B&R - Cover

Bauen & Renovieren

Stahlbleche als Unterboden für den Estrich

Als Ersatz für marode Dielen bieten sich so genannte Schwalbenschwanzplatten an (von Spillner), die als Schalung und Bewehrung für Estriche oder Beton dienen.

weiter lesen
Metamorphose - Cover

Metamorphose - Bauen im Bestand

Mit den Metallschalungen „Lewis“ und „Max 4“ hat das Unternehmen Spillner Spezialbaustoffe (SSB) für jede erdenkliche Situation bei der Fußbodensanierung die passende Lösung im Programm.

zum Artikel
BBA Cover

BBA Infoservice

MAX4® Fußbodensystem mit speziellem Stahlgewebe für besonders dünne und leichte Estrichböden.

weiter lesen
OSTBAU Cover

Messe Bau 2009, München

Fußbodensanierung leicht gemacht.

Mit den Produkten LEWIS ®, HODY ® und MAX 4 ® sind Architekten, Bauherren und Handwerker für jede Fußbodensanierung gut gerüstet.

weiter lesen